• $ ...

    Energy Saved*
  • ...

    Acres of Trees Saved
  • ...

    Houses Taken off of Grid
  • ...

    Pounds of CO2 Saved
  • ...

    Teacher's Jobs Retained

(937) 877-1919

Oak Hills Local Schools

Oak Hills Local Schools

Cincinnati, OH

Project Cost: $4 million
Annual Payback: $373,835

Project Scope:

  • Eleven Buildings, including the District’s Central Office and the Bus Garage
  • Replacement of interior lighting with more efficient lamps
  • Removal of unnecessary lamps to cut waste
  • Exterior LED lighting
  • Controls commissioning, repairs, upgrades, integration and advanced energy management controls programming
  • Installation of:
    • Energy efficient kitchen measures
    • Solar thermal system to heat the Oak Hills High School swimming pool
    • Block heater controls for the bus terminals
Oak Hills High School
© 2015 Energy Optimizers, USA | All Rights Reserved.